As the slogan for Adamstown says"Its starting to take shape" |
087 arrives into Kildare with the Ballina-Waterford Norfolk Liner |
087 arrived at Kildare on the middle road |
The shunter un-couples 087 from its train |
203 arrives at Kildare on the 11:30 Heuston-Waterford service |
The train consisted of 17 boxes and 1 tank. |
087 running round its train at Kildare |
087 approaches the containers to couple up. |
087 waits at Kildare for the up Waterford to clear the section ahead |
4004 is looped through at Kildare despite it not stopping. |
227 pushes the Mk4s into Dublin a week after it returned from works |
6104 arrives at Kildare with the 10:45 Waterford-Dublin service. |
The carpark at Kildare is packed to capacity |
206 powers through Kildare on the ex Galway |
750 bounces into Kildare heading for depot. |
29110 departs Kildare with the 13:10 service to Heuston |
209 arrives at Kildare with the 12:40 service to Westport |
A high speed passing 217 and 4008 meet at Kildare |
204 arrives with a hauled push-pull set on the 13:25 service to Limerick |
212 pulls into Kildare with the 12:25 from Limerick |
201 waits to enter Heuston, while 219 departs with the very busy 15:00 to Cork |
220 departs with its push-pull set on the 15:05 to Waterford |
134+124 depart from platform 10 with their train of laden ballast |
134+124 at Islandbridge Junction with a ballast train |
134+124 are returning from North Wall where they loaded the ballast. |
Small GMs galore 170, 134+124 all pass together |
Waht a nice sight in 2007 3 small GMs revving up the gullet! |
134+124 back into the old guinness sidings, the ballast is to be dropped at Adamstown station |
170 now shunts back with the Mk3s while 134+124 disconnect from their train |
134+124 returning to Inchicore |
| | | |